Construction management and inspection services on this $5.4M signature tubular steel bridge in the City of Tempe consisting of 4,225’ simple span tied arches. Working closely with the contractor and steel fabricators to ensure that the final bridge product matches that of the design plans. Coordinating with the designing engineers the staging erection analysis which consists of step by step cable stressing analysis and a crane pick procedure, ensuring the final geometry of the bearing locations, and fielding RFI’s. (September 2010 through September 2011)